Home
Services
Projects
Bamberg, City theatre
Grand Theatre de Geneve
Leipzig
Luxembourg
Munich
Speyer
References
Who we are
Contact
 
Francais
Deutsch
Print

Speyer: City Hall

Stage technology

Small Audience (300 Seats)

The small audience that was destroyed by fire, was completely renewed. Essentially the works consist of the reconstruction of the supporting structure of the roof and the installation of an acoustic ceiling in which houses the necessary stage technical equipment.
The new wooden parquet floor received plugs for the installation of light sound equipment. This allows the flexible use of the space.
The new stage area that can be separated from the audience has 10 mobile platforms and a big projection screen.

Big Audience (600 seats)

The big Audience with about 600 seats is connected to the foyer. It has a centres stage of about 150m². The stage technical equipment was much out of date and showed big defaults in the safety installations. Transport problems within the building made it even more difficult to carry out events.
As an essential change for the improvement of the use of the of the big audience, the platform of the orchestra pit was renewed so that it can be used as a means of transport. Furthermore the centre stage was demolished and replaced by a telescopic platform device. Furthermore a cabin for the sound and lighting control was installed. Besides the enlargement of the windows which also allow a use with national daylight the audience has gained a new value through the renovation of the ventilation and a completely new lighting system.

 

History
The project
Architecture
Stage technology

   

    © 2008 Gerling + Arendt Planungsgesellschaft mbH     Editor's Notes     e-mail: info@gerling-arendt.de