| |
![]() |
||||||||||||||||||||
|
Speyer: City HallThe Project: Transformation into a multifunction centreGerling +Arendt submitted a concept of renovation for the municipal hall of Speyer in July 2002. The project implied essentially the new conception and renewal of
The renovation measures were to be realised by maintaining as much as possible the exterior structure of the building. At the same time, the adaptation to the existing rules and standards for venues and the realisation of innovative measures for the maintenance of the structure of the building had to be assured. The rather colourless building with the typical shape from the 60ies got a stronger contour within the cityscape.
|
||||||||||||||||||||
| © 2008 Gerling + Arendt Planungsgesellschaft mbH Editor's Notes e-mail: info@gerling-arendt.de | |||||||||||||||||||||
![]() |
|
| The new transparent foyer | Close |