| |
![]() |
||||||||||||||||||||
|
Geneva: Grand TheatreStage technology: Conception and technical dataThe priority of the new system was to install a maximum number of point hoists and fly bars with a high capacity. The flexible use of the point hoists requires a free grid. All machines and converter pulleys were conceived and placed accordingly to allow a flexible positioning of the point hoists. The actual installation includes:
The control system allows individual movements, group and synchronised movements for a group of 18 flies.
|
||||||||||||||||||||
| © 2008 Gerling + Arendt Planungsgesellschaft mbH Editor's Notes e-mail: info@gerling-arendt.de | |||||||||||||||||||||
![]() |
|
| Compact arrangement of winches: planning ... | Close |
![]() |
|
| ... and construction | Close |