| |
![]() |
||||||||||||||||||||
|
Bamberg: E.T.A. Hoffmann TheatreThe Project: Renewal of the Stage technical EquipmentThe E.T.A. Hoffmann is located in the historic centre of Bamberg and is surrounded by streets and squares. After an overall renovation of the building, the theatre now presents itself as a transparent building with new foyer spaces, a restructured configuration of the technical spaces, a new studio and new audiences. Because of the historic reconstruction works and a fire in the audience, the project took more than three years. The theatre was reopened in October 2003. Gerling and Arendt were responsible for the design and realisation of the stage technical equipment. Essentially, the renovation implied a complete renewal of the stage technical installations. The existing stage tower was dismantled and replaced by a new one. Up to that time, the theatre had worked with manual flies and a fix stage floor without lifting devices.
|
||||||||||||||||||||
| © 2008 Gerling + Arendt Planungsgesellschaft mbH Editor's Notes e-mail: info@gerling-arendt.de | |||||||||||||||||||||
![]() |
|
| Ground plan of the stage | close |
![]() |
|
| Longitudinal section of the theatre | close |