| |
![]() |
||||||||||||||||||||
|
Bamberg: E.T.A. Hoffmann TheatreStage lightingThe stage lighting and also the general lighting had to be renewed completely, including all the cabling. Only the lighting control board for scenic lighting could be reused. For the control of the installation, modern BUS technology was installed. Therefore, an extension or change of the control functions is possible later very easily. The installation consists of 230 dimmable circuits (3,0 kVA and 5,0 kVA) and 78 switches. These are combined in blocks of two. The module structure and the dimensioning of the cabling allows an assignment of the circuits according to the different needs.
|
||||||||||||||||||||
| © 2008 Gerling + Arendt Planungsgesellschaft mbH Editor's Notes e-mail: info@gerling-arendt.de | |||||||||||||||||||||
![]() |
|
| The auditorium, a listed monument | Schließen |